Petronas Kerteh Platform

Malaysia

Water Engineers delivered an OxiMax electrochlorination solution for Petronas Kerteh Platform in Malaysia. Installed in 2009, the project was designed for offshore and matched to the site's required duty.

Project Overview

Petronas Kerteh Platform required a robust water-treatment solution suited to the operating conditions at Malaysia. Reliability, controlled disinfectant generation and ease of maintenance were key project considerations.

Water Engineers supplied an OxiMax MV Series system with a rated chlorine capacity of 1 x 3.3 kg/hr. The equipment produces disinfectant on site, giving operators direct control over dosing while limiting reliance on transported chlorine chemicals.

The installation provides a dependable treatment platform designed for long-term operation. Its on-site generation approach supports safer chemical management, consistent treatment performance and practical servicing throughout the equipment lifecycle.

Project Details

Location
Malaysia

Application
Offshore

Chlorine Capacity
1 x 3.3 kg/hr

OxiMax Equipment
MV Series

Year Installed
2009