Water Engineers delivered an OxiMax electrochlorination solution for Wild Wadi Water Park in Dubai, UAE. Installed in 2006, the project was designed for water treatment and matched to the site's required duty.
Wild Wadi Water Park required a robust water-treatment solution suited to the operating conditions at Dubai, UAE. Reliability, controlled disinfectant generation and ease of maintenance were key project considerations.
Water Engineers supplied an OxiMax MA Series system with a rated chlorine capacity of 14 kg/hr. The equipment produces disinfectant on site, giving operators direct control over dosing while limiting reliance on transported chlorine chemicals.
The installation provides a dependable treatment platform designed for long-term operation. Its on-site generation approach supports safer chemical management, consistent treatment performance and practical servicing throughout the equipment lifecycle.
Location
Dubai, UAE
Application
Water Treatment
Chlorine Capacity
14 kg/hr
OxiMax Equipment
MA Series
Year Installed
2006
Talk to Water Engineers about an OxiMax system designed for your water treatment, disinfection or biofouling-control application.